Martic Township publishes a mandatory pumping ordinance amended March 3, 2025, its own septic report, and a direct SEO contact. Call the township for the current property due date and use the Martic form when the tank is pumped. Bring the notice and any previous report to the scheduling call, identify all tanks and pump chambers, and confirm the current filing method before service.
Get the current due date from Martic
A mandatory program can change forms, phases, fees, or intervals through amendment. Call Martic Township at 717-284-2167 or SEO Duane Truax at 717-205-2228. Request the last accepted pumping date, current ordinance interval, reporting deadline, and any pumper eligibility rule before booking.
Keep the written answer or municipal notice with the service record. Do not import Pequea’s, Drumore’s, or West Lampeter’s cycle merely because the same provider works there. Act 537 local administration makes township boundaries meaningful.
Use the Martic reporting form
A generic invoice may omit observations the municipal form expects. Provide the current Martic form to the pumper and agree on who returns it. Retain a copy and verify receipt. The form record should connect the tank, property, date, hauler, removal, and visible system concerns.
Pennsylvania DEP separately registers residential septage haulers and requires the five-digit transporter number on the truck. Ask for the accepting provider and current registration; this routing site holds no hauler credential itself.
Wooded slopes and rural lanes need advance access planning
Martic reaches from Pequea-area roads toward wooded and river-influenced terrain. Tanks can sit below a house, behind outbuildings, or beyond a narrow lane. Describe grade, turns, overhead branches, gates, soft soil, and hose distance. A heavy vacuum truck should not cross the absorption area or reserved replacement ground.
- Start with the permit drawing and mark the main tank access.
- Identify pumps, alarms, dosing chambers, and any second dwelling.
- Keep roof, spring, and sump water away from the field.
- Tell the scheduler about steep or winter access before dispatch.
New bedrooms require sewage review first
Martic’s SEO page warns that a building permit for a new home or added bedroom will not issue before the sewage permit. That sequence protects the approved design flow and available treatment area. Contact the SEO before construction, not after framing reveals that the existing system was never sized for the change.
A pumper cannot convert a maintenance receipt into capacity approval. System design, testing, permit, and required inspections remain municipal functions.
When the visit shows more than maintenance
A broken lid or dirty filter may have a contained repair path. Return flow, surface sewage, chronic backup, or a failing pump needs diagnosis and possibly permitted alteration. Stop water use during an active problem and ask the SEO which work requires approval. Do not accept an open discharge or bypass as a temporary “fix.”
Local rules and service references
Rules and contacts can change. Check the current township record before relying on a deadline or form.